Tap between 345 kV SW Shreveport to Dolet Hills Substations (GEN-2023-030)

Tap between 345 kV SW Shreveport to Dolet Hills Substations is a 25.0 MW solar interconnection project in DeSoto Parish, Louisiana with a current status of withdrawn. It is proposed to connect at Tap between 345 kV SW Shreveport to Dolet Hills Substations.

25.0 MWCapacity
WithdrawnStatus
LAMarket
SolarTechnology

Project facts

Canonical nameTap between 345 kV SW Shreveport to Dolet Hills Substations
Queue IDGEN-2023-030
Statuswithdrawn
Source statusWITHDRAWN
MarketLA
TechnologySolar
Capacity25.0 MW
StateLouisiana
CountyDeSoto Parish
Point of interconnectionTap between 345 kV SW Shreveport to Dolet Hills Substations
Requested (queue) date2023-10-02
Proposed in-service date2027-12-31
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata