Tap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub (J635)
Tap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub is a 35.0 MW solar interconnection project in Concordia Parish, Louisiana with a current status of withdrawn. It is proposed to connect at Tap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub.
Project facts
| Canonical name | Tap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub |
|---|---|
| Queue ID | J635 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 35.0 MW |
| State | Louisiana |
| County | Concordia Parish |
| Point of interconnection | Tap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub |
| Requested (queue) date | 2016-05-09 |
| Proposed in-service date | 2018-02-28 |
| Operational date | 2018-02-28 |
| Withdrawn date | 2017-06-15 |
| Developer | — |
| Utility / transmission owner | ENTERGY ARKANSAS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata