Tap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub (J635)

Tap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub is a 35.0 MW solar interconnection project in Concordia Parish, Louisiana with a current status of withdrawn. It is proposed to connect at Tap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub.

35.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameTap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub
Queue IDJ635
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity35.0 MW
StateLouisiana
CountyConcordia Parish
Point of interconnectionTap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub
Requested (queue) date2016-05-09
Proposed in-service date2018-02-28
Operational date2018-02-28
Withdrawn date2017-06-15
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.