Tap Flat Ridge 2 East (#532792) – Viola (#532798) 345kV (GEN-2016-010)

Tap Flat Ridge 2 East (#532792) – Viola (#532798) 345kV is a 134.0 MW wind interconnection project in Harper, Kansas with a current status of withdrawn. It is proposed to connect at Tap Flat Ridge 2 East (#532792) – Viola (#532798) 345kV.

134.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameTap Flat Ridge 2 East (#532792) – Viola (#532798) 345kV
Queue IDGEN-2016-010
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity134.0 MW
StateKansas
CountyHarper
Point of interconnectionTap Flat Ridge 2 East (#532792) – Viola (#532798) 345kV
Requested (queue) date2016-03-24
Proposed in-service date
Operational date
Withdrawn date2016-08-04
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata