Tap Hastings (635033) - Macedonia (635069) 69 kV line at about midpoint (J1530)

Tap Hastings (635033) - Macedonia (635069) 69 kV line at about midpoint is a 50.0 MW solar interconnection project in Mills, Iowa with a current status of operational. It is proposed to connect at Tap Hastings (635033) - Macedonia (635069) 69 kV line at about midpoint.

50.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameTap Hastings (635033) - Macedonia (635069) 69 kV line at about midpoint
Queue IDJ1530
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity50.0 MW
StateIowa
CountyMills
Point of interconnectionTap Hastings (635033) - Macedonia (635069) 69 kV line at about midpoint
Requested (queue) date2021-04-16
Proposed in-service date2023-09-15
Operational date2023-09-15
Withdrawn date
Developer
Utility / transmission ownerMIDAMERICAN ENERGY CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata