Tap Hobbs - Yoakum 230kV (GEN-2014-070)

Tap Hobbs - Yoakum 230kV is a 113.0 MW solar interconnection project in Lea, New Mexico with a current status of withdrawn. It is proposed to connect at Tap Hobbs - Yoakum 230kV.

113.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameTap Hobbs - Yoakum 230kV
Queue IDGEN-2014-070
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity113.0 MW
StateNew Mexico
CountyLea
Point of interconnectionTap Hobbs - Yoakum 230kV
Requested (queue) date2014-09-29
Proposed in-service date
Operational date
Withdrawn date2015-06-01
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.