TAP HOLCOMB – SPEARVILLE 345kV (GEN-2010-045)

TAP HOLCOMB – SPEARVILLE 345kV is a 197.8 MW wind interconnection project in Ford County, Kansas with a current status of withdrawn. It is proposed to connect at TAP HOLCOMB – SPEARVILLE 345kV.

197.8 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameTAP HOLCOMB – SPEARVILLE 345kV
Queue IDGEN-2010-045
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity197.8 MW
StateKansas
CountyFord County
Point of interconnectionTAP HOLCOMB – SPEARVILLE 345kV
Requested (queue) date2010-09-29
Proposed in-service date2017-12-31
Operational date
Withdrawn date2018-04-15
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.