Tap Kelly(WERE) - S1399(OPPD) 161kV (GEN-2007-015)

Tap Kelly(WERE) - S1399(OPPD) 161kV is a 135.0 MW wind interconnection project in Nemaha County, Kansas with a current status of withdrawn. It is proposed to connect at Tap Kelly(WERE) - S1399(OPPD) 161kV.

135.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameTap Kelly(WERE) - S1399(OPPD) 161kV
Queue IDGEN-2007-015
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity135.0 MW
StateKansas
CountyNemaha County
Point of interconnectionTap Kelly(WERE) - S1399(OPPD) 161kV
Requested (queue) date2007-03-27
Proposed in-service date
Operational date
Withdrawn date2013-07-20
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.