Tap Little Elk - Hobart 138kV (GEN-2012-029)

Tap Little Elk - Hobart 138kV is a 100.3 MW wind interconnection project in Kiowa, Oklahoma with a current status of withdrawn. It is proposed to connect at Tap Little Elk - Hobart 138kV.

100.3 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameTap Little Elk - Hobart 138kV
Queue IDGEN-2012-029
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity100.3 MW
StateOklahoma
CountyKiowa
Point of interconnectionTap Little Elk - Hobart 138kV
Requested (queue) date2012-09-28
Proposed in-service date
Operational date
Withdrawn date2013-03-01
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.