Tap Marmaton - Centerville 161kV (GEN-2015-016)

Tap Marmaton - Centerville 161kV is a 200.0 MW wind interconnection project in Allen County, Kansas with a current status of operational. It is proposed to connect at Tap Marmaton - Centerville 161kV.

200.0 MWCapacity
OperationalStatus
KSMarket
WindTechnology

Project facts

Canonical nameTap Marmaton - Centerville 161kV
Queue IDGEN-2015-016
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketKS
TechnologyWind
Capacity200.0 MW
StateKansas
CountyAllen County
Point of interconnectionTap Marmaton - Centerville 161kV
Requested (queue) date2015-03-20
Proposed in-service date
Operational date2017-12-31
Withdrawn date
Developer
Utility / transmission ownerKCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata