Tap Maryville - Midway 161kV (GEN-2006-014 TAP) (GEN-2006-017)

Tap Maryville - Midway 161kV (GEN-2006-014 TAP) is a 300.0 MW wind interconnection project in Nodaway, Missouri with a current status of withdrawn. It is proposed to connect at Tap Maryville - Midway 161kV (GEN-2006-014 TAP).

300.0 MWCapacity
WithdrawnStatus
MOMarket
WindTechnology

Project facts

Canonical nameTap Maryville - Midway 161kV (GEN-2006-014 TAP)
Queue IDGEN-2006-017
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyWind
Capacity300.0 MW
StateMissouri
CountyNodaway
Point of interconnectionTap Maryville - Midway 161kV (GEN-2006-014 TAP)
Requested (queue) date2006-06-02
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerMIPU

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata