Tap Maryville - Midway (GEN-2006-014 TAP) 161kV (GEN-2007-053)

Tap Maryville - Midway (GEN-2006-014 TAP) 161kV is a 110.0 MW wind interconnection project in Nodaway County, Missouri with a current status of withdrawn. It is proposed to connect at Tap Maryville - Midway (GEN-2006-014 TAP) 161kV.

110.0 MWCapacity
WithdrawnStatus
MOMarket
WindTechnology

Project facts

Canonical nameTap Maryville - Midway (GEN-2006-014 TAP) 161kV
Queue IDGEN-2007-053
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyWind
Capacity110.0 MW
StateMissouri
CountyNodaway County
Point of interconnectionTap Maryville - Midway (GEN-2006-014 TAP) 161kV
Requested (queue) date2007-11-19
Proposed in-service date
Operational date
Withdrawn date2012-01-30
Developer
Utility / transmission ownerMIPU

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata