Tap Neosho – Crawford 69 kV (GEN-2017-050)

Tap Neosho – Crawford 69 kV is a 25.0 MW solar interconnection project in Crawford County, Kansas with a current status of withdrawn. It is proposed to connect at Tap Neosho – Crawford 69 kV.

25.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameTap Neosho – Crawford 69 kV
Queue IDGEN-2017-050
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity25.0 MW
StateKansas
CountyCrawford County
Point of interconnectionTap Neosho – Crawford 69 kV
Requested (queue) date2017-05-04
Proposed in-service date
Operational date
Withdrawn date2020-12-04
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.