Tap on the JEC-Hoyt 345kV line (approximately 10 miles from JEC) (GEN-2015-074)

Tap on the JEC-Hoyt 345kV line (approximately 10 miles from JEC) is a 174.0 MW wind interconnection project in Nemaha County, Kansas with a current status of withdrawn. It is proposed to connect at Tap on the JEC-Hoyt 345kV line (approximately 10 miles from JEC).

174.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameTap on the JEC-Hoyt 345kV line (approximately 10 miles from JEC)
Queue IDGEN-2015-074
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity174.0 MW
StateKansas
CountyNemaha County
Point of interconnectionTap on the JEC-Hoyt 345kV line (approximately 10 miles from JEC)
Requested (queue) date2015-09-28
Proposed in-service date
Operational date
Withdrawn date2016-04-26
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.