Tap on the Mullen Creek to Ketchum 345 kV Line (GEN-2022-208)

Tap on the Mullen Creek to Ketchum 345 kV Line is a 400.0 MW wind interconnection project in Andrew/Gentry/Dekalb, Missouri with a current status of withdrawn. It is proposed to connect at Tap on the Mullen Creek to Ketchum 345 kV Line.

400.0 MWCapacity
WithdrawnStatus
MOMarket
WindTechnology

Project facts

Canonical nameTap on the Mullen Creek to Ketchum 345 kV Line
Queue IDGEN-2022-208
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyWind
Capacity400.0 MW
StateMissouri
CountyAndrew/Gentry/Dekalb
Point of interconnectionTap on the Mullen Creek to Ketchum 345 kV Line
Requested (queue) date2023-03-01
Proposed in-service date2027-12-01
Operational date
Withdrawn date2025-03-06
Developer
Utility / transmission ownerKCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.