Tap Pawnee Valley - Hanston 69kV (GEN-2017-049)

Tap Pawnee Valley - Hanston 69kV is a 50.0 MW solar interconnection project in Hodgeman County, Kansas with a current status of withdrawn. It is proposed to connect at Tap Pawnee Valley - Hanston 69kV.

50.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameTap Pawnee Valley - Hanston 69kV
Queue IDGEN-2017-049
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity50.0 MW
StateKansas
CountyHodgeman County
Point of interconnectionTap Pawnee Valley - Hanston 69kV
Requested (queue) date2017-05-04
Proposed in-service date
Operational date
Withdrawn date2020-12-04
Developer
Utility / transmission ownerMIDW

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata