Tap Saint Joseph - Cooper (Mill Creek) 345kV (GEN-2010-056)

Tap Saint Joseph - Cooper (Mill Creek) 345kV is a 151.2 MW wind interconnection project in Holt County, Missouri with a current status of withdrawn. It is proposed to connect at Tap Saint Joseph - Cooper (Mill Creek) 345kV.

151.2 MWCapacity
WithdrawnStatus
MOMarket
WindTechnology

Project facts

Canonical nameTap Saint Joseph - Cooper (Mill Creek) 345kV
Queue IDGEN-2010-056
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyWind
Capacity151.2 MW
StateMissouri
CountyHolt County
Point of interconnectionTap Saint Joseph - Cooper (Mill Creek) 345kV
Requested (queue) date2010-10-25
Proposed in-service date
Operational date
Withdrawn date2014-09-15
Developer
Utility / transmission ownerMIPU

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata