Tap South Roosevelt – Tolk 230kV (GEN-2015-010)

Tap South Roosevelt – Tolk 230kV is a 250.7 MW wind interconnection project in Roosevelt County, New Mexico with a current status of withdrawn. It is proposed to connect at Tap South Roosevelt – Tolk 230kV.

250.7 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology

Project facts

Canonical nameTap South Roosevelt – Tolk 230kV
Queue IDGEN-2015-010
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologyWind
Capacity250.7 MW
StateNew Mexico
CountyRoosevelt County
Point of interconnectionTap South Roosevelt – Tolk 230kV
Requested (queue) date2015-03-31
Proposed in-service date
Operational date
Withdrawn date2015-10-22
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata