Tap Substation on the Beach Station – Redline 115kV line (GEN-2010-048)

Tap Substation on the Beach Station – Redline 115kV line is a 70.0 MW wind interconnection project in Graham County, Kansas with a current status of withdrawn. It is proposed to connect at Tap Substation on the Beach Station – Redline 115kV line.

70.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameTap Substation on the Beach Station – Redline 115kV line
Queue IDGEN-2010-048
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity70.0 MW
StateKansas
CountyGraham County
Point of interconnectionTap Substation on the Beach Station – Redline 115kV line
Requested (queue) date2010-09-30
Proposed in-service date
Operational date
Withdrawn date2017-01-10
Developer
Utility / transmission ownerMIDW

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata