Tap Sunnyside-Hugo 345 kV Line (GEN-2017-043)

Tap Sunnyside-Hugo 345 kV Line is a 1,550.0 MW other interconnection project in Bryan County, Oklahoma with a current status of withdrawn. It is proposed to connect at Tap Sunnyside-Hugo 345 kV Line.

1,550.0 MWCapacity
WithdrawnStatus
OKMarket
OtherTechnology

Project facts

Canonical nameTap Sunnyside-Hugo 345 kV Line
Queue IDGEN-2017-043
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyOther
Capacity1,550.0 MW
StateOklahoma
CountyBryan County
Point of interconnectionTap Sunnyside-Hugo 345 kV Line
Requested (queue) date2017-05-26
Proposed in-service date
Operational date
Withdrawn date2018-06-11
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata