Tap Tolk - Eddy County (Crossroads) 345kV is a 40.0 MW solar interconnection project in Roosevelt, New Mexico with a current status of withdrawn. It is proposed to connect at Tap Tolk - Eddy County (Crossroads) 345kV.

40.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameTap Tolk - Eddy County (Crossroads) 345kV
Queue IDGEN-2014-047
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity40.0 MW
StateNew Mexico
CountyRoosevelt
Point of interconnectionTap Tolk - Eddy County (Crossroads) 345kV
Requested (queue) date2014-09-30
Proposed in-service date2017-10-01
Operational date
Withdrawn date2018-04-06
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata