Tap Wichita - Emporia 345kV CKT 1 is a 200.1 MW wind interconnection project in Marion, Kansas with a current status of withdrawn. It is proposed to connect at Tap Wichita - Emporia 345kV CKT 1.

200.1 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameTap Wichita - Emporia 345kV CKT 1
Queue IDGEN-2013-020
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity200.1 MW
StateKansas
CountyMarion
Point of interconnectionTap Wichita - Emporia 345kV CKT 1
Requested (queue) date2013-06-28
Proposed in-service date
Operational date
Withdrawn date2013-10-23
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata