Tap Wolf Creek - LaCygne 345kV (GEN-2009-049)

Tap Wolf Creek - LaCygne 345kV is a 102.0 MW wind interconnection project in Coffey County, Kansas with a current status of withdrawn. It is proposed to connect at Tap Wolf Creek - LaCygne 345kV.

102.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameTap Wolf Creek - LaCygne 345kV
Queue IDGEN-2009-049
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity102.0 MW
StateKansas
CountyCoffey County
Point of interconnectionTap Wolf Creek - LaCygne 345kV
Requested (queue) date2009-10-26
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata