Tap Woodring-Cimarron 345kV Line (GEN-2016-104)

Tap Woodring-Cimarron 345kV Line is a 400.0 MW wind interconnection project in Sumner, Kansas with a current status of withdrawn. It is proposed to connect at Tap Woodring-Cimarron 345kV Line.

400.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameTap Woodring-Cimarron 345kV Line
Queue IDGEN-2016-104
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity400.0 MW
StateKansas
CountySumner
Point of interconnectionTap Woodring-Cimarron 345kV Line
Requested (queue) date2016-11-02
Proposed in-service date
Operational date
Withdrawn date2017-04-06
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata