Tap Woodward - Tatonga 345kV (GEN-2011-051 Tap) is a 105.6 MW wind interconnection project in Woodward, Oklahoma with a current status of withdrawn. It is proposed to connect at Tap Woodward - Tatonga 345kV (GEN-2011-051 Tap).

105.6 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameTap Woodward - Tatonga 345kV (GEN-2011-051 Tap)
Queue IDGEN-2013-035
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity105.6 MW
StateOklahoma
CountyWoodward
Point of interconnectionTap Woodward - Tatonga 345kV (GEN-2011-051 Tap)
Requested (queue) date2013-12-20
Proposed in-service date
Operational date
Withdrawn date2015-03-19
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata