Tap Woodward - Thistle 345kV Ckt 1 (GEN-2012-016)

Tap Woodward - Thistle 345kV Ckt 1 is a 312.0 MW other interconnection project in Mooreland, Oklahoma with a current status of withdrawn. It is proposed to connect at Tap Woodward - Thistle 345kV Ckt 1.

312.0 MWCapacity
WithdrawnStatus
OKMarket
OtherTechnology

Project facts

Canonical nameTap Woodward - Thistle 345kV Ckt 1
Queue IDGEN-2012-016
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyOther
Capacity312.0 MW
StateOklahoma
CountyMooreland
Point of interconnectionTap Woodward - Thistle 345kV Ckt 1
Requested (queue) date2012-08-24
Proposed in-service date
Operational date
Withdrawn date2014-03-05
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata