Tatonga 345 kV Substation (GEN-2023-SR5)

Tatonga 345 kV Substation is a 85.0 MW battery interconnection project in Seiling, Oklahoma with a current status of active. It is proposed to connect at Tatonga 345 kV Substation.

85.0 MWCapacity
ActiveStatus
OKMarket
BatteryTechnology

Project facts

Canonical nameTatonga 345 kV Substation
Queue IDGEN-2023-SR5
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketOK
TechnologyBattery
Capacity85.0 MW
StateOklahoma
CountySeiling
Point of interconnectionTatonga 345 kV Substation
Requested (queue) date2022-12-15
Proposed in-service date2026-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata