Tatonga 345kV (GEN-2010-011)

Tatonga 345kV is a 29.7 MW wind interconnection project in Dewey County, Oklahoma with a current status of operational. It is proposed to connect at Tatonga 345kV.

29.7 MWCapacity
OperationalStatus
OKMarket
WindTechnology

Project facts

Canonical nameTatonga 345kV
Queue IDGEN-2010-011
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketOK
TechnologyWind
Capacity29.7 MW
StateOklahoma
CountyDewey County
Point of interconnectionTatonga 345kV
Requested (queue) date2010-03-31
Proposed in-service date
Operational date2011-12-31
Withdrawn date
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata