Tatonga-Woodward 345 kV (proposed substation for GEN-2011-051) is a 180.0 MW wind interconnection project in Dewey, Oklahoma with a current status of withdrawn. It is proposed to connect at Tatonga-Woodward 345 kV (proposed substation for GEN-2011-051).

180.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameTatonga-Woodward 345 kV (proposed substation for GEN-2011-051)
Queue IDGEN-2015-081
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity180.0 MW
StateOklahoma
CountyDewey
Point of interconnectionTatonga-Woodward 345 kV (proposed substation for GEN-2011-051)
Requested (queue) date2015-09-24
Proposed in-service date
Operational date
Withdrawn date2017-06-15
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata