Taum Sauk 138kV Switchyard, Bus 1 & 2 (J1213)

Taum Sauk 138kV Switchyard, Bus 1 & 2 is a 60.0 MW other interconnection project in Iron County, Missouri with a current status of operational. It is proposed to connect at Taum Sauk 138kV Switchyard, Bus 1 & 2.

60.0 MWCapacity
OperationalStatus
Market
OtherTechnology

Project facts

Canonical nameTaum Sauk 138kV Switchyard, Bus 1 & 2
Queue IDJ1213
Statusoperational
Source statusDone
Market
TechnologyOther
Capacity60.0 MW
StateMissouri
CountyIron County
Point of interconnectionTaum Sauk 138kV Switchyard, Bus 1 & 2
Requested (queue) date2019-04-27
Proposed in-service date2022-12-31
Operational date2022-12-31
Withdrawn date
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata