Taum Sauk (2108_2)

Taum Sauk is a 204.0 MW battery interconnection project in Reynolds, Missouri with a current status of operational.

204.0 MWCapacity
OperationalStatus
MISOMarket
BatteryTechnology

Project facts

Canonical nameTaum Sauk
Queue ID2108_2
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyBattery
Capacity204.0 MW
StateMissouri
CountyReynolds
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1963-12-01
Withdrawn date
Developer
Utility / transmission ownerUnion Electric Co - (MO)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata