Taylor Switching Station 115 kV Substation (GEN-2024-306)

Taylor Switching Station 115 kV Substation is a 150.0 MW battery interconnection project in Lea, New Mexico with a current status of withdrawn. It is proposed to connect at Taylor Switching Station 115 kV Substation.

150.0 MWCapacity
WithdrawnStatus
NMMarket
BatteryTechnology

Project facts

Canonical nameTaylor Switching Station 115 kV Substation
Queue IDGEN-2024-306
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologyBattery
Capacity150.0 MW
StateNew Mexico
CountyLea
Point of interconnectionTaylor Switching Station 115 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2031-12-31
Operational date
Withdrawn date2026-05-21
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.