Tazewell-Baileyville 138kV (U2-024)
Tazewell-Baileyville 138kV is a 900.0 MW gas interconnection project in McDowell, West Virginia with a current status of withdrawn.
900.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology
Project facts
| Canonical name | Tazewell-Baileyville 138kV |
|---|---|
| Queue ID | U2-024 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Gas |
| Capacity | 900.0 MW |
| State | West Virginia |
| County | McDowell |
| Point of interconnection | — |
| Requested (queue) date | 2008-05-23 |
| Proposed in-service date | 2012-05-01 |
| Operational date | — |
| Withdrawn date | 2009-01-06 |
| Developer | — |
| Utility / transmission owner | AEP |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata