TBD (CS26-05)

TBD is a 225.0 MW wind interconnection project in Garfield, Washington with a current status of active. It is proposed to connect at Dry Creek - Talbot 230kV.

225.0 MWCapacity
ActiveStatus
WAMarket
WindTechnology

Project facts

Canonical nameTBD
Queue IDCS26-05
Statusactive
Source statusCluster Study
MarketWA
TechnologyWind
Capacity225.0 MW
StateWashington
CountyGarfield
Point of interconnectionDry Creek - Talbot 230kV
Requested (queue) date2026-04-24
Proposed in-service date2030-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAvista Utilities

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata