TC-Eva Texas County 69kV (GEN-2009-073T)

TC-Eva Texas County 69kV is a 46.5 MW wind interconnection project in Texas County, Oklahoma with a current status of withdrawn. It is proposed to connect at TC-Eva Texas County 69kV.

46.5 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameTC-Eva Texas County 69kV
Queue IDGEN-2009-073T
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity46.5 MW
StateOklahoma
CountyTexas County
Point of interconnectionTC-Eva Texas County 69kV
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date2013-07-22
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.