TCHPP Position JC 120kV (R1041)

TCHPP Position JC 120kV is a 220.0 MW generation interconnection project with a current status of operational. It is proposed to connect at TCHPP Position JC 120kV.

220.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameTCHPP Position JC 120kV
Queue IDR1041
Statusoperational
Source statusDone
Market
TechnologyGeneration
Capacity220.0 MW
State
CountyWayne
Point of interconnectionTCHPP Position JC 120kV
Requested (queue) date2023-10-11
Proposed in-service date2025-05-31
Operational date2025-05-31
Withdrawn date
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.