TCI Alvar (64306_TCI2)

TCI Alvar is a 1.9 MW solar interconnection project in Orleans, Louisiana with a current status of operational.

1.9 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameTCI Alvar
Queue ID64306_TCI2
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologySolar
Capacity1.9 MW
StateLouisiana
CountyOrleans
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2019-04-01
Withdrawn date—
Developer—
Utility / transmission ownerENTERGY ARKANSAS

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata