Tesla Reno GigaFactory (64098_3)

Tesla Reno GigaFactory is a 1.0 MW solar interconnection project in Storey, Nevada with a current status of active.

1.0 MWCapacity
ActiveStatus
NEVPMarket
SolarTechnology

Project facts

Canonical nameTesla Reno GigaFactory
Queue ID64098_3
Statusactive
Source status(TS) Construction complete, but not yet in commercial operation
MarketNEVP
TechnologySolar
Capacity1.0 MW
StateNevada
CountyStorey
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTesla Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02proposed_online_date2026-09-012026-12-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata