Tesla Reno GigaFactory (64098_3)
Tesla Reno GigaFactory is a 1.0 MW solar interconnection project in Storey, Nevada with a current status of active.
1.0 MWCapacity
ActiveStatus
NEVPMarket
SolarTechnology
Project facts
| Canonical name | Tesla Reno GigaFactory |
|---|---|
| Queue ID | 64098_3 |
| Status | active |
| Source status | (TS) Construction complete, but not yet in commercial operation |
| Market | NEVP |
| Technology | Solar |
| Capacity | 1.0 MW |
| State | Nevada |
| County | Storey |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2026-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tesla Inc. |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata