The Lakes Substation (L0379)

The Lakes Substation is a 11.1 MW other interconnection project in Benton, Washington with a current status of withdrawn. It is proposed to connect at Red Mountain-Richland #1 115kV line.

11.1 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameThe Lakes Substation
Queue IDL0379
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity11.1 MW
StateWashington
CountyBenton
Point of interconnectionRed Mountain-Richland #1 115kV line
Requested (queue) date2014-10-16
Proposed in-service date2018-10-01
Operational date
Withdrawn date
DeveloperBenton Rural Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.