Thetford #1 - Dort 138kV T-Line (J1537)

Thetford #1 - Dort 138kV T-Line is a 150.0 MW solar interconnection project in Genesee, Michigan with a current status of withdrawn. It is proposed to connect at Thetford #1 - Dort 138kV T-Line.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameThetford #1 - Dort 138kV T-Line
Queue IDJ1537
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateMichigan
CountyGenesee
Point of interconnectionThetford #1 - Dort 138kV T-Line
Requested (queue) date2020-06-23
Proposed in-service date2024-07-04
Operational date2024-07-04
Withdrawn date2022-12-01
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.