Thompson Creek Mine Load (L0628)

Thompson Creek Mine Load is a 28.0 MW other interconnection project in Custer, Idaho with a current status of operational. It is proposed to connect at Round Valley Substation.

28.0 MWCapacity
OperationalStatus
IDMarket
OtherTechnology

Project facts

Canonical nameThompson Creek Mine Load
Queue IDL0628
Statusoperational
Source statusBPA COMPLETED
MarketID
TechnologyOther
Capacity28.0 MW
StateIdaho
CountyCuster
Point of interconnectionRound Valley Substation
Requested (queue) date2024-09-25
Proposed in-service date
Operational date2027-09-25
Withdrawn date
DeveloperSalmon River Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.