Thompson Road 138kV Substation (J1292)

Thompson Road 138kV Substation is a 198.0 MW wind interconnection project in Ionia County, Michigan with a current status of operational. It is proposed to connect at Thompson Road 138kV Substation.

198.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameThompson Road 138kV Substation
Queue IDJ1292
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity198.0 MW
StateMichigan
CountyIonia County
Point of interconnectionThompson Road 138kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2021-05-01
Operational date2021-05-01
Withdrawn date
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata