Thunderbird Generator (Tbird) (63575_TBRID)

Thunderbird Generator (Tbird) is a 1.0 MW other interconnection project in Lyon, Kansas with a current status of operational.

1.0 MWCapacity
OperationalStatus
SWPPMarket
OtherTechnology

Project facts

Canonical nameThunderbird Generator (Tbird)
Queue ID63575_TBRID
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologyOther
Capacity1.0 MW
StateKansas
CountyLyon
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2019-05-01
Withdrawn date—
Developer—
Utility / transmission owner4 Rivers Electric Cooperative, Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata