Tie Substation 69 kV (GEN-2022-041)

Tie Substation 69 kV is a 100.0 MW solar interconnection project in Cowley, Kansas with a current status of withdrawn. It is proposed to connect at Tie Substation 69 kV.

100.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameTie Substation 69 kV
Queue IDGEN-2022-041
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity100.0 MW
StateKansas
CountyCowley
Point of interconnectionTie Substation 69 kV
Requested (queue) date2022-06-29
Proposed in-service date2025-12-31
Operational date
Withdrawn date2025-03-06
Developer
Utility / transmission ownerGHP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata