Tihart-Latson 138 kV (J1925)

Tihart-Latson 138 kV is a 100.0 MW solar interconnection project in Livingston, Michigan with a current status of withdrawn. It is proposed to connect at Tihart-Latson 138 kV.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameTihart-Latson 138 kV
Queue IDJ1925
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateMichigan
CountyLivingston
Point of interconnectionTihart-Latson 138 kV
Requested (queue) date2021-08-17
Proposed in-service date2023-11-01
Operational date2023-11-01
Withdrawn date2023-09-06
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.