Tipton (8106_2)

Tipton is a 1.3 MW other interconnection project in Cedar, Iowa with a current status of operational.

1.3 MWCapacity
OperationalStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameTipton
Queue ID8106_2
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyOther
Capacity1.3 MW
StateIowa
CountyCedar
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1971-04-01
Withdrawn date—
Developer—
Utility / transmission ownerCity of Tipton - (IA)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata