Tipton Station 161 kV Substation (GEN-2022-113)

Tipton Station 161 kV Substation is a 200.0 MW solar interconnection project in Newton, Missouri with a current status of withdrawn. It is proposed to connect at Tipton Station 161 kV Substation.

200.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology

Project facts

Canonical nameTipton Station 161 kV Substation
Queue IDGEN-2022-113
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologySolar
Capacity200.0 MW
StateMissouri
CountyNewton
Point of interconnectionTipton Station 161 kV Substation
Requested (queue) date2023-02-16
Proposed in-service date2027-12-31
Operational date
Withdrawn date2025-03-06
Developer
Utility / transmission ownerEDE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata