TITTABAWASSEE 345kV- GALLEGHER 345kV (J3928)

TITTABAWASSEE 345kV- GALLEGHER 345kV is a 200.0 MW wind interconnection project in Bay, Michigan with a current status of withdrawn. It is proposed to connect at TITTABAWASSEE 345kV- GALLEGHER 345kV.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameTITTABAWASSEE 345kV- GALLEGHER 345kV
Queue IDJ3928
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateMichigan
CountyBay
Point of interconnectionTITTABAWASSEE 345kV- GALLEGHER 345kV
Requested (queue) date2025-01-31
Proposed in-service date2030-10-30
Operational date2030-10-30
Withdrawn date2026-04-15
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.