Tiverton Uprate (954)

Tiverton Uprate is a 287.5 MW gas interconnection project in Newport, Rhode Island with a current status of operational. It is proposed to connect at Interconnection with Narragansett Electric Company's M13 and L14 115kV line taps to NEC's Tiverton substation..

287.5 MWCapacity
OperationalStatus
SEMAMarket
GasTechnology

Project facts

Canonical nameTiverton Uprate
Queue ID954
Statusoperational
Source statusC
MarketSEMA
TechnologyGas
Capacity287.5 MW
StateRhode Island
CountyNewport
Point of interconnectionInterconnection with Narragansett Electric Company's M13 and L14 115kV line taps to NEC's Tiverton substation.
Requested (queue) date2020-03-05
Proposed in-service date
Operational date2021-05-31
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata