Todd 25kV (AC2-005)

Todd 25kV is a 3.0 MW solar interconnection project in Dorchester, Maryland with a current status of withdrawn.

3.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameTodd 25kV
Queue IDAC2-005
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity3.0 MW
StateMaryland
CountyDorchester
Point of interconnection
Requested (queue) date2016-11-01
Proposed in-service date2018-03-31
Operational date
Withdrawn date2017-01-23
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.