Tonawanda Creek Wind (0238)

Tonawanda Creek Wind is a 75.0 MW wind interconnection project in Genesee, New York with a current status of withdrawn. It is proposed to connect at Lockport Ð Batavia 115kV.

75.0 MWCapacity
WithdrawnStatus
AMarket
WindTechnology

Project facts

Canonical nameTonawanda Creek Wind
Queue ID0238
Statuswithdrawn
Source status0
MarketA
TechnologyWind
Capacity75.0 MW
StateNew York
CountyGenesee
Point of interconnectionLockport Ð Batavia 115kV
Requested (queue) date2007-01-30
Proposed in-service date2009-07-31
Operational date
Withdrawn date
DeveloperTonawanda Creek Wind, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.